Electrical & CHP

Grid Protection Relay

Monitors voltage (U>> 110 %, U< 85 %) and frequency (f> 50.2 Hz, f< 49.8 Hz); on grid failure disconnects within 200 ms — prevents islanding and protects the plant from grid disturbances.

Grid handover point between CHP and public network.

Free BHKW analysis from public data →

Related topics

Grid FrequencyFull-Load Hours / Operating HoursPower-to-Heat Ratio (σ)Self-ConsumptionKWK Subsidy Meter