Gas train

Gas Storage / Level

Optimal fill level: 40–80 %; PLC control starts CHP at approx. 65 % fill and stops at approx. 30 % — prevents underpressure and ensures continuous gas supply.

Above the fermenter or as separate gas storage, buffer between biogas production and CHP consumption.

Free BHKW analysis from public data →

Related topics

Gas Pressure / Supply PressureGas Quality / Methane NumberFlame MonitoringGas Valve TrainGas Meter